© 2018 by Gateway Design Studio, llc. Proudly created with Wix.com

Berry Park
Eureka, Missouri

Gateway Design Studio provided park planning and engineering services pertaining to a 23 acre site. As part of the design process, GDS conducted systematic analysis of the existing conditions and provided suggestions through evaluation of potential site improvements related to such factors as the protection of natural resources, design of athletic/multipurpose field pedestrian & vehicular circulation, storm water mitigation, a playground, shelters and restrooms.

The City’s goals and objectives were to included park amenities such as a playground, multipurpose field/open space, pavilions, walking paths/trails, a future pedestrian bridge crossing at the creek, parking areas, restroom and anticipate future planned road improvements. CLICK ON THE IMAGES BELOW FOR DESCRIPTIONS.

KEY ELEMENTS

  •    Park Master Planning

  •    Drought/Salt Resistance Plants

  •    Native Plant Material

  •    Playground Design

  •    Natural Resource Protection

  •    LED Site Lighting

  •    Flood Plain Study

  •    Sustainable Design for Maintenance

  •    Pervious Asphalt Parking Lot

SERVICES:

  •    Park Planning

  •    Civil Engineering,

  •    Landscape Design

  •    Sustainable Design

 

CLIENT:

  • City of Eureka, MO

YEAR BUILT:

  • Completed 2010